Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures
Abstract
The Office of Surface Mining Reclamation and Enforcement (OSM) is confirming the effective date of January 27, 2026, for the direct final rule "Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures," published on November 28, 2025. The direct final rule removes paragraphs that required that all surface drainage from the disturbed area pass through a siltation structure before leaving the permit area. These provisions were struck down by a reviewing court in 1985 and have no legal effect but were never removed from the Code of Federal Regulations. During the comment period, OSM received one substantive comment. That comment was not a significant adverse comment because it did not effectively challenge the rule's underlying premise or approach or explain why the rule would be inappropriate without a change. As a result, the comment does not warrant a delay of the effective date.
Federal Register Source
This document is published by the Office of the Federal Register, National Archives and Records Administration. Access the full regulatory text, preamble, and docket comments below.
View Full Text on FederalRegister.gov →Opens in new tab · federalregister.gov
Frequently Asked Questions
What is the 2026-01570 Federal Register document?
Is document 2026-01570 an economically significant rule?
Other Rules from Interior
Read our methodology - how this data is sourced, computed, and verified.
Related
Every figure on PlainRegWatch is rendered directly from state source data, no number is typed in by an editor. This page draws directly on federal and state source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.