Rescission of Portions of Permanent Program Performance Standards Related to Siltation Structures
Abstract
This direct final rule revises the Federal regulations to remove paragraphs that required that all surface drainage from the disturbed area pass through a siltation structure before leaving the permit area. These paragraphs were struck down on judicial review because the court found that the Office of Surface Mining Reclamation and Enforcement (OSMRE) had not articulated a sufficient basis for the rule under the Administrative Procedure Act and that OSMRE had not sufficiently demonstrated that siltation structures were the best technology currently available.
Federal Register Source
This document is published by the Office of the Federal Register, National Archives and Records Administration. Access the full regulatory text, preamble, and docket comments below.
View Full Text on FederalRegister.gov →Opens in new tab · federalregister.gov
Frequently Asked Questions
What is the 2025-21441 Federal Register document?
Is document 2025-21441 an economically significant rule?
Other Rules from Interior
Read our methodology - how this data is sourced, computed, and verified.
Related
Every figure on PlainRegWatch is rendered directly from state source data, no number is typed in by an editor. This page draws directly on federal and state source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.