Building for the Future Through Electric Regional Transmission Planning and Cost Allocation

Agency
Document Number
2025-06941
Published
April 28, 2025
Effective Date
January 6, 2025

Abstract

In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs.

Federal Register Source

This document is published by the Office of the Federal Register, National Archives and Records Administration. Access the full regulatory text, preamble, and docket comments below.

View Full Text on FederalRegister.gov →

Opens in new tab · federalregister.gov

Frequently Asked Questions

What is the 2025-06941 Federal Register document?
Document 2025-06941 is a Final Rule published by the Department of Energy in the Federal Register on April 28, 2025, with an effective date of January 6, 2025. In this order, the Federal Energy Regulatory Commission addresses arguments raised on rehearing, grants clarification, in part, and denies clarification, in part, of Order No. 1920-A, which addressed arguments raised on rehearing of, set aside, in part, and clarified Order No. 1920. Order No. 1920 required transmission providers, inter alia, to conduct Long-Term Regional Transmission Planning to ensure the identification, evaluation, and selection, as well as the allocation of the costs, of more efficient or cost-effective regional transmission solutions to address Long-Term Transmission Needs. View the original at https://www.federalregister.gov/documents/2025/04/28/2025-06941/building-for-the-future-through-electric-regional-transmission-planning-and-cost-allocation.
Is document 2025-06941 an economically significant rule?
No. Document 2025-06941 is not classified as economically significant under Executive Order 12866. Economically significant rules require OIRA review and are estimated to have impacts of $100 million or more per year.
Data sourced from official state legislatures, IAPP, NCSL, and federal regulatory trackers. See our methodology for details. Retrieved and formatted by PlainRegWatch Editorial

Every figure on PlainRegWatch is rendered directly from state source data, no number is typed in by an editor. This page draws directly on federal and state source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.