Home / Agencies / NRC / 2024-30721
Final Rule

Non-Power Production or Utilization Facility License Renewal

Agency
Document Number
2024-30721
Published
December 30, 2024
Effective Date
January 29, 2025

Abstract

The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations that govern the license renewal process for certain production or utilization facilities. In this final rule, the NRC collectively refers to these facilities as non-power production or utilization facilities (NPUFs). This final rule revises the definitions of "non-power reactor," "research reactor," and "testing facility." This final rule also eliminates license terms for licenses for facilities used for medical therapy or research and development, other than testing facilities; these licenses are issued under the authority of Sections 104a or 104c of the Atomic Energy Act of 1954, as amended (AEA). This final rule defines the license renewal process for licenses issued to testing facilities under the authority of Section 104c of the AEA or commercial or industrial NPUFs (including testing facilities) under the authority of Section 103 of the AEA. This final rule requires all NPUF licensees to submit to the NRC final safety analysis report (FSAR) updates at intervals not to exceed 5 years. In addition, this final rule provides an accident dose criterion of 1 Roentgen equivalent man (rem) (0.01 sievert [Sv]) total effective dose equivalent (TEDE) for NPUFs other than testing facilities. The NRC is also issuing final implementation guidance for this final rule.

Federal Register Source

This document is published by the Office of the Federal Register, National Archives and Records Administration. Access the full regulatory text, preamble, and docket comments below.

View Full Text on FederalRegister.gov →

Opens in new tab · federalregister.gov

Frequently Asked Questions

What is the 2024-30721 Federal Register document?
Document 2024-30721 is a Final Rule published by the Nuclear Regulatory Commission in the Federal Register on December 30, 2024, with an effective date of January 29, 2025. The U.S. Nuclear Regulatory Commission (NRC) is amending its regulations that govern the license renewal process for certain production or utilization facilities. In this final rule, the NRC collectively refers to these facilities as non-power production or utilization facilities (NPUFs). This final rule revises the definitions of "non-power reactor," "research reactor," and "testing facility." This final rule also eliminates license terms for licenses for facilities used for medical therapy or research and development, other than testing facilities; these licenses are issued under the authority of Sections 104a or 104c of the Atomic Energy Act of 1954, as amended (AEA). This final rule defines the license renewal process for licenses issued to testing facilities under the authority of Section 104c of the AEA or commercial or industrial NPUFs (including testing facilities) under the authority of Section 103 of the AEA. This final rule requires all NPUF licensees to submit to the NRC final safety analysis report (FSAR) updates at intervals not to exceed 5 years. In addition, this final rule provides an accident dose criterion of 1 Roentgen equivalent man (rem) (0.01 sievert [Sv]) total effective dose equivalent (TEDE) for NPUFs other than testing facilities. The NRC is also issuing final implementation guidance for this final rule. View the original at https://www.federalregister.gov/documents/2024/12/30/2024-30721/non-power-production-or-utilization-facility-license-renewal.
Is document 2024-30721 an economically significant rule?
No. Document 2024-30721 is not classified as economically significant under Executive Order 12866. Economically significant rules require OIRA review and are estimated to have impacts of $100 million or more per year.
Data sourced from official state legislatures, IAPP, NCSL, and federal regulatory trackers. See our methodology for details. Retrieved and formatted by PlainRegWatch Editorial

Every figure on PlainRegWatch is rendered directly from state source data, no number is typed in by an editor. This page draws directly on federal and state source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.