Regulatory Guide: Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities
Abstract
The U.S. Nuclear Regulatory Commission (NRC) is issuing Revision 1 to Regulatory Guide (RG) 1.30, "Installation, Inspection, and Testing for Class 1E Power, Instrumentation, and Control Equipment at Production and Utilization Facilities." This RG describes an approach that is acceptable to the NRC staff to meet the regulatory requirements for installation, inspection, and testing for Class 1E power, instrumentation, and control equipment at production and utilization facilities.
Federal Register Source
This document is published by the Office of the Federal Register, National Archives and Records Administration. Access the full regulatory text, preamble, and docket comments below.
View Full Text on FederalRegister.gov →Opens in new tab · federalregister.gov
Frequently Asked Questions
What is the 2024-08720 Federal Register document?
Is document 2024-08720 an economically significant rule?
Other Rules from NRC
Read our methodology - how this data is sourced, computed, and verified.
Related
Every figure on PlainRegWatch is rendered directly from state source data, no number is typed in by an editor. This page draws directly on federal and state source data, no figure is typed in by an editor. See our editorial standards & corrections policy, the methodology behind these numbers, or report a data error.